Funkey logo

Wind Farm

4/5 of 1 reviews
Wind Farm header image
Back to overview

Hands-on sustainability challenge where teams build a wind-driven structure and try to optimize their CO2 score through creative tasks.

From € 65 p.p. (VAT excl.)

Based on 20 participants

Possible in these languages

Dutch, French, English

From 10 to 310 participants

Available in these regions

Antwerp, Brussels, East Flanders and8 more

Description

Wind Farm is a unique and hands-on team building around sustainability, creativity, and collaboration. Teams are challenged to build a wind-driven structure that can lift a weight at least 1 meter off the ground using wind energy.

Each team receives a box of building materials with which they must work as efficiently as possible. But there's an extra challenge: each component has its own CO2 footprint. Teams must not only build a working structure but also strategically think about how to keep their total ecological impact as low as possible.

After the building phase, the interactive sustainability challenge begins via an app-based game. During this challenge, teams perform various tasks to offset the CO2 footprint of their structure. The game combines quiz questions about sustainability and innovation with creative photo and video assignments that provide extra energy, fun, and team dynamics.

Finally, all structures are tested with an electric leaf blower, and we calculate the final net CO2 score. The team with a working structure and the best balance between performance and sustainability is declared the winner.

Wind Farm is an original team building where collaboration, problem-solving, creativity, communication, and strategic insight are central. The activity can be organized both indoors and outdoors and is ideal for teams that want to collaborate interactively around innovation and sustainability.

Photos

Variants

From € 65 p.p. (VAT excl.)

Cheaper from 21 participants: From € 63,57 (VAT excl.)

Wind Farm short version

01:30 hours
€65 p.p. (VAT excl.)

In this version of Wind Farm, teams will only do the building phase of the activity and will not work with the interactive app. Teams will try to build a working structure and keep the carbon footprint as low as possible.

Wind Farm Full Version

02:30 hours
€90 p.p. (VAT excl.)

Teams first build a structure with the lowest possible carbon footprint and then proceed with the interactive app-based "Sustainability Challenge" to earn carbon offset. The net-carbon footprint determines the final score.

Traits

Based on these four properties, you will quickly find out what you can expect from the activity. This way you can tailor your teambuilding even better to the needs of your team.

  • Teamwork
  • Competition
  • Action
  • Learning

Good to know

Location
Location of choice.
Location requirements

To work ergonomically, we recommend providing 1 table per 7 people and approximately 12m2 per team.

Other

Teams of a maximum of 7 people.
We recommend providing 1 table per team.
Duration 120' - 180'

  • Transport costs:
    • 1/km

    Cost applies per 75 participants

  • Available in these regions

    This activity can take place in these regions

    Belgium
    Antwerp
    Brussels
    Hainaut
    Liège
    Namur
    East Flanders
    West Flanders
    Flemish Brabant
    Walloon Brabant
    Limburg
    Luxembourg

    Categories

    Looking for something similar? Hundreds of team buildings are waiting for you in these categories.

    Loading...