Funkey logo

Sustainable Energy Challenge

5/5 of 1 reviews
Sustainable Energy Challenge header image
Back to overview

In different teams, you build your own wind turbine. The tower is constructed according to the blueprint, but the blades are made according to your own design. Play challenging games that have a link with sustainability. Coins are won for all activities, which are dropped in the sustainability barometer on your own team table! In the finale, the wind turbines are tested for 'hurricane force', namely placed in front of the fan! Which team generates the most energy in this challenge?

From € 35 p.p. (VAT excl.)

Based on 25 participants

Possible in these languages

Dutch, English

From 25 to 250 participants

Available in these regions

Antwerp, Brussels, East Flanders and15 more

Description

In this unique, green, and challenging competition, you and your team will build a wind turbine. Different teams will work with first-class construction materials according to a blueprint. However, the blades are created according to your own design. Which team generates the most energy? A competition with sustainability as the theme; it requires collaboration, problem-solving skills, and communication. There are various tasks to be divided within each team.

You will work with a Meccano system developed by us for the construction of the tower. Using bolts and nuts, the parts are attached according to the blueprint. The blades are made according to your own design. This is done with aluminum tubes, adapters for 3- and 4-blade wind blades, laser-cut MDF holders that can be chosen and attached in 4 angle degrees and 4 length sizes. The dynamo must be earned by cracking a code, with knowledge about sustainability.

Participants who have no affinity with technology are challenged with thinking, strategic, and agility games that have something to do with the theme. With an assortment of now more than 200 different games, we can always place a varied, extensive selection.

In the finale, all participants stand around the wind turbines, which are tested... How many Amperes of current does each wind turbine generate?

Photos

Variants

From € 35 p.p. (VAT excl.)

Sustainable Energy Challenge

02:30 hours
€35 p.p. (VAT excl.)
?

Sustainable Energy Challenge XXL

02:30 hours
€59 p.p. (VAT excl.)
?

The activity is the same as the Sustainable Energy Challenge, but with much larger materials resulting in wind turbines that are 3 to 4.5 meters high. In the XXL variant, overalls and safety helmets are also available.

Traits

Based on these four properties, you will quickly find out what you can expect from the activity. This way you can tailor your teambuilding even better to the needs of your team.

  • Teamwork
  • Competition
  • Action
  • Learning

Good to know

Location

• Locatie naar keuze.

Location requirements

- At least 30 m2 is needed per team of 10 - 18 people. At least 2 m2 of space is required per participant. In case of the XXL version, 5 m2 of space is needed per participant, and a free height of at least 4.30 meters.
- Preferably indoor. Outdoor only possible if it is not raining and there is no wind.

Other

- In case of rain or chance of rain, an indoor location is needed. Otherwise, this activity cannot take place.
- At least 2 m2 of space is required per participant. In case of the XXL version, 5 m2 of space is needed per participant, and a free height of at least 4.30 meters.

  • Transport costs:
    • 0.6/km + €125
  • Available in these regions

    This activity can take place in these regions

    Belgium
    Antwerp
    Brussels
    East Flanders
    West Flanders
    Flemish Brabant
    Limburg

    Categories

    Looking for something similar? Hundreds of team buildings are waiting for you in these categories.

    Loading...